first couple tiles coming out
Date: 04/30/12
first couple tiles coming out
last of the old 12 x 12 tile coming down -ugggggly
Date: 05/09/12
old sconce lights out, new temporary ceiling lights fished and connected
Date: 05/24/12
power, cable, and network fished through wall to where the TV will be in the master bedroom
Date: 05/24/12
re-framed and sheetrocked this wall to even it out
Date: 06/04/12
cracked wallboard removed from closet, and ceiling demo'd
Date: 06/04/12
damaged section of rear wall replaced, new ceiling installed with 3W LED lights (LED drivers buried in that junction box)
Date: 06/07/12
the other 2 3W LED's in the closet ceiling (3 total)
Date: 06/07/12
new 2-gang box installed with seperate switches for the 2 sides of the room
Date: 06/07/12
Sheetrock all finished. Time to mud/joint.
Date: 06/28/12