built-in storage bumped back to be flush with new wall thickness
Date: 06/01/12
 
4" can lights in the hallway.  These will get 9.5w LED cree's
Date: 06/01/12
 
brace added so center joist could be chopped for light down steps
Date: 06/01/12
 
view looking up to the new stairwell light  in the area that was previously a continuous slope down
Date: 06/01/12
 
view of all the added network and TV cabling routed down
Date: 06/01/12
 
added an outlet to the hallway
Date: 06/07/12
 
mess of wiring moved into junction box, single two-way switch for hall/stair lights installed
Date: 06/07/12
 
rear view of 2-gang added to bring switches for office together
Date: 06/07/12
 
2-gang added to bring switches for office lighting together (one was in hallway outside the door)
Date: 06/07/12
 
Drywall getting installed
Date: 06/12/12
 
More drywall
Date: 06/13/12
 
closing up holes used for fishing wire
Date: 06/15/12
 
cut out and replaced previous un-even repair
Date: 06/15/12
 
Joint compound all finished.  Ready for primer.
Date: 07/01/12
 
Rebuilt door jamb.
Date: 07/01/12