first couple tiles coming out Date: 04/30/12 first couple tiles coming out
last of the old 12 x 12 tile coming down -ugggggly Date: 05/09/12
DSC_8199 Date: 05/09/12
DSC_8200 Date: 05/09/12
DSC_8201 Date: 05/09/12
DSC_8203 Date: 05/09/12
DSC_8223 Date: 05/09/12
DSC_8224 Date: 05/09/12
old sconce lights out, new temporary ceiling lights fished and connected Date: 05/24/12
power, cable, and network fished through wall to where the TV will be in the master bedroom Date: 05/24/12
DSC_8351 Date: 05/24/12
DSC_8352 Date: 05/24/12
DSC_8353 Date: 05/24/12
re-framed and sheetrocked this wall to even it out Date: 06/04/12
cracked wallboard removed from closet, and ceiling demo'd Date: 06/04/12
damaged section of rear wall replaced, new ceiling installed with 3W LED lights (LED drivers buried in that junction box) Date: 06/07/12
the other 2 3W LED's in the closet ceiling (3 total) Date: 06/07/12
DSC_8406 Date: 06/07/12
DSC_8408 Date: 06/07/12
DSC_8416 Date: 06/07/12
new 2-gang box installed with seperate switches for the 2 sides of the room Date: 06/07/12
Sheetrock all finished. Time to mud/joint. Date: 06/28/12
04 Date: 06/28/12
[-]